Nukewatch

Working for a nuclear-free future since 1979

  • Issues
    • Direct Action
    • Environmental Justice
    • Nuclear Power
      • Chernobyl
      • Fukushima
    • Nuclear Weapons
    • On The Bright Side
    • Radiation Exposure
    • Radioactive Waste
    • Renewable Energy
    • Uranium Mining
    • US Bombs Out of Germany
  • Quarterly Newsletter
    • Quarterly Newsletter
    • Newsletter Archives
  • Resources
    • Nuclear Heartland Book
    • Fact Sheets
    • Reports, Studies & Publications
      • The New Nuclear Weapons: $1.74 Trillion for H-bomb Profiteers and Fake Cleanups
      • Nuclear Power: Dead In the Water It Poisoned
      • Thorium Fuel’s Advantages as Mythical as Thor
      • Greenpeace on Fukushima 2016
      • Drinking Water at Risk: Toxic Military Wastes Haunt Lake Superior
    • Nukewatch in the News
    • Links
    • Videos
  • About
    • About Nukewatch
    • Contact Us
  • Get Involved
    • Action Alerts!
    • Calendar
  • Donate

April 18, 2024 by Nukewatch Leave a Comment

Latest Litany of Accidents at WIPP

By Lindsay Potter

The Waste Isolation Pilot Plant, the nation’s only permanent repository for radioactive waste from nuclear weapons production, is a network of 2,000-foot-deep caverns in a salt bed roughly 30 miles east of Carlsbad, New Mexico. In its 35 years of operation, WIPP has been plagued by accidents and mishandlings resulting in radioactive releases and contamination of the land, air, and workers, requiring temporary work stoppages. One radioactive catastrophe and explosion of improperly packed rad waste in 2014 caused a dangerous level of contamination causing work to be paused for several years. A new shaft, like four others already at WIPP, had to be designed to increase air flow and create access to additional cavern space. The $100 million new shaft, in tandem with a $470 million renovation of the ventilation system, plan to triple the “air capacity…allowing maintenance, mining, and waste operations to occur simultaneously,” according to the Carlsbad Current-Argus.

WIPP recently won a 10-year permit renewal, effective Nov. 3, 2023, nullifying its original 2024 closure. However, reports of three accidents during the new shaft construction within roughly one month last fall led to a temporary stop work order. In October, a swinging skid steer collided with the scaffolding platform of the shaft. In two incidents in November, a rigging cable snapped in the shaft, in one case causing the loading “basket” to sail 2,000 feet to the mine’s floor. Work began again on December 16. — Carlsbad Current-Argus, Jan. 26 and Jan. 3, 2024; Nuclear Newswire, Oct. 12, 2023

 

nuclearactive.org

Filed Under: Newsletter Archives, Quarterly Newsletter, Radioactive Waste

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Stay Connected

  • Facebook
  • Twitter

Subscribe

Donate

Categories

  • B61 Bombs in Europe
  • Chernobyl
  • Counterfeit Reactor Parts
  • Depleted Uranium
  • Direct Action
  • Environment
  • Environmental Justice
  • Fukushima
  • Lake Superior Barrels
  • Military Spending
  • Newsletter Archives
  • North Korea
  • Nuclear Power
  • Nuclear Weapons
  • Office News
  • On The Bright Side
  • Photo Gallery
  • Protect the Water Close Xcel's Monticello Reactor
  • Quarterly Newsletter
  • Radiation Exposure
  • Radioactive Waste
  • Renewable Energy
  • Social Issues
  • Sulfide Mining
  • Through the Prism of Nonviolence
  • Uncategorized
  • Uranium Mining
  • US Bombs Out of Germany
  • War
  • Weekly Column

Contact Us

(715) 472-4185
nukewatch1@lakeland.ws

Address:
740A Round Lake Road
Luck, Wisconsin 54853
USA

Donate To Nukewatch

News & Information on Nuclear Weapons,
Power, Waste & Nonviolent Resistance

Stay Connected

  • Facebook
  • Twitter

© 2026 · Nukewatch