Nukewatch

Working for a nuclear-free future since 1979

  • Issues
    • Weekly Column
    • Counterfeit Reactor Parts
    • Depleted Uranium
    • Direct Action
    • Lake Superior Barrels
    • Environmental Justice
    • Nuclear Power
      • Chernobyl
      • Fukushima
    • Nuclear Weapons
    • On The Bright Side
    • Radiation Exposure
    • Radioactive Waste
    • Renewable Energy
    • Uranium Mining
    • US Bombs Out of Germany
  • Quarterly Newsletter
    • Quarterly Newsletter
    • Newsletter Archives
  • Resources
    • Nuclear Heartland Book
    • Fact Sheets
    • Reports, Studies & Publications
      • The New Nuclear Weapons: $1.74 Trillion for H-bomb Profiteers and Fake Cleanups
      • Nuclear Power: Dead In the Water It Poisoned
      • Thorium Fuel’s Advantages as Mythical as Thor
      • Greenpeace on Fukushima 2016
      • Drinking Water at Risk: Toxic Military Wastes Haunt Lake Superior
    • Nukewatch in the News
    • Links
    • Videos
  • About
    • About Nukewatch
    • Contact Us
  • Get Involved
    • Action Alerts!
    • Calendar
    • Workshops
  • Donate

October 15, 2015 by Nukewatch Leave a Comment

NSP/Xcel Accused of Falsified Weld Tests

Nukewatch Quarterly Fall 2015

The nuclear utility Northern States Power or NSP/Xcel Energy was accused July 27 of deliberately violating safety procedures and then falsifying reports on unfinished tests of heavy casks holding high-level radioactive waste at its Monticello reactor, 35 miles northwest of Minneapolis, Minnesota. Six large waste storage casks are known to have been inadequately tested, according to Nuclear Regulatory Commission (NRC) inspectors. Five of the six inadequately welded casks have already been closed up and placed in large, concrete vaults which are just outside the reactor building site on the Mississippi River. Over 450 tons of the high-level waste fuel has accumulated at the 44-year-old General Electric reactor, exactly like the three Fukushima reactors that were wrecked by meltdowns in 2011 in Japan. Contractors had been testing for cracks in welds sealing the steel casks loaded with the extremely deadly radioactive waste. While required to conduct a ten-minute test, some were cut off after only 23 seconds. One of them told NRC investigators he felt rushed because heard “management complain about employees working too slowly.” For the $12 billion company with 12,000 employees, cutting corners also involved falsifying formal reports to the NRC about the incomplete welding tests. The NRC’s findings indicate that the agency could bring criminal charges and is considering “escalating enforcement action.”—Minneapolis Star Tribune, July 27; Counterpunch, Aug. 28, 2015

Filed Under: Environment, Newsletter Archives, Quarterly Newsletter, Radioactive Waste

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Stay Connected

  • Facebook
  • Twitter

Subscribe

Donate

Facebook

Categories

  • B61 Bombs in Europe
  • Chernobyl
  • Counterfeit Reactor Parts
  • Depleted Uranium
  • Direct Action
  • Environment
  • Environmental Justice
  • Fukushima
  • Lake Superior Barrels
  • Military Spending
  • Newsletter Archives
  • North Korea
  • Nuclear Power
  • Nuclear Weapons
  • Office News
  • On The Bright Side
  • Photo Gallery
  • Quarterly Newsletter
  • Radiation Exposure
  • Radioactive Waste
  • Renewable Energy
  • Sulfide Mining
  • Through the Prism of Nonviolence
  • Uncategorized
  • Uranium Mining
  • US Bombs Out of Germany
  • War
  • Weekly Column

Contact Us

(715) 472-4185
nukewatch1@lakeland.ws

Address:
740A Round Lake Road
Luck, Wisconsin 54853
USA

Donate To Nukewatch

News & Information on Nuclear Weapons,
Power, Waste & Nonviolent Resistance

Stay Connected

  • Facebook
  • Twitter

© 2023 · Nukewatch