Nukewatch

Working for a nuclear-free future since 1979

  • Issues
    • Direct Action
    • Environmental Justice
    • Nuclear Power
      • Chernobyl
      • Fukushima
    • Nuclear Weapons
    • On The Bright Side
    • Radiation Exposure
    • Radioactive Waste
    • Renewable Energy
    • Uranium Mining
    • US Bombs Out of Germany
  • Quarterly Newsletter
    • Quarterly Newsletter
    • Newsletter Archives
  • Resources
    • Nuclear Heartland Book
    • Fact Sheets
    • Reports, Studies & Publications
      • The New Nuclear Weapons: $1.74 Trillion for H-bomb Profiteers and Fake Cleanups
      • Nuclear Power: Dead In the Water It Poisoned
      • Thorium Fuel’s Advantages as Mythical as Thor
      • Greenpeace on Fukushima 2016
      • Drinking Water at Risk: Toxic Military Wastes Haunt Lake Superior
    • Nukewatch in the News
    • Links
    • Videos
  • About
    • About Nukewatch
    • Contact Us
  • Get Involved
    • Action Alerts!
    • Calendar
  • Donate

October 17, 2022 by Nukewatch Leave a Comment

Business Case for Nuclear Power Collapsed Forty Years Ago — Economist

By Amory Lovins

Nuclear reactor purchase orders collapsed to zero in [1978] the year before Three Mile Island because they cost too much. How do we know? The cover story of the last 1978 issue of Business Week, months before TMI, reported nuclear power’s commercial collapse. TMI, Chernobyl, and Fukushima only emphasized the industry’s slow-motion collapse caused not by public fears but by the lack of a business case.

Chancellor Angela Merkel didn’t decide to phase out nuclear power only after Fukushima in 2011; Germany had already written the phaseout into its atomic law in 2002 after a national consensus process in 2001. Fukushima only reversed a delay (added months before) and [Germany] returned to the original 2022 phaseout date. Now the last three reactors may run briefly, probably a few months, into 2023 to help 1-2% with the Russian gas crisis.

https://diablocanyonpanel.org/history-of-dcpp/

 

California’s legislature just voted to extend Diablo Canyon five years beyond its planned 2024/25 retirement at age 40 — if it meets a slew of conditions it’s unlikely to meet, such as showing 1) the extension is needed, 2) won’t cost too much, and 3) its gotten all required federal approvals and subsidies. In other words they voted to do the analyses no one had done when the Governor’s office, a few weeks before adjournment, introduced this proposal that no state agency or utility had requested, reversing a thoroughly analyzed 2016 agreement that nearly all the legislators had approved just four years ago. Nothing significant changed since except the Governor’s mind.

Renewables’ [often claimed] “unreliability and relatively small contribution to overall power generation” is untrue. Renewables outproduce nuclear energy in the US and the world, and are growing rapidly while nuclear output is stagnant or falling. Solar cells and wind turbines do produce varying output, but those variations are more predictable than nuclear reactors’ bigger, longer, and more abrupt failures. Solar and wind power’s unpredictable (“forced”) outages are roughly one-tenth those of nuclear power, so they need less and cheaper backup to keep the grid reliable.

State-level data confirm that abrupt nuclear retirement (not with the 9-year notice provided in California) can briefly raise gas-fired generation, but only for a year or two; then renewables and efficiency can contest the market space and grid capacity that the nuclear reactor sat on, they win, and they get installed. Since they’re cheaper than running the closed [reactor], they displace more fossil-fueled generation for the same cost, and for many times longer, so they protect the climate better than continuing to run the uneconomic nuclear unit.

— Amory Lovins is a physicist, an architect, an engineering scholar, co-founder of the Rocky Mountain Institute and currently Adjunct Professor of Civil and Environmental Engineering at Stanford University.

Filed Under: Environment, Environmental Justice, Newsletter Archives, Nuclear Power, Quarterly Newsletter

October 17, 2022 by Nukewatch 1 Comment

EPA Announces Shutdown of Online Archives

By Elena Hight

 

Less than a year after Environmental Protection Agency Administrator Michael Regan declared his wish for the EPA to operate “in a ‘fishbowl’ once again,” the agency has decided to close or “sunset” its online archive. The archive hosts digital records of EPA resources, policy changes, regulatory actions, enforcement, and compliance dating back to the 1990s, and it is a vital resource for communities, activist groups, researchers, historians, and citizens.

Although far from perfect, the archive contains reports on thousands of sites within the United States, and it is a rich source of data that individuals can use to better understand the government’s response to a myriad of environmental issues. The closure of this archive signals the abandonment of transparency and the expressed values of administrator Regan.

Activists and environmental organizations have condemned the decision. In a June 13 open letter to the EPA from the Environmental Governance and Data Initiative, the EGDI wrote, “Overall, the lack of transparency in the decision to sunset the EPA’s archive is at odds with the EPA’s commitment to openness.” And, the group added, the closure leaves both the public and federal government “dependent upon third-party non-governmental organizations” to maintain records, groups that are not bound by “federal data integrity and provenance policies.” The EGDI letter is co-signed by 20 other organizations, including the Union of Concerned Scientists, the Internet Archive, and the Sierra Club.

While public pressure caused the EPA to delay archive closure for a year, until July 2023, it is still unclear exactly why the EPA wants to shutter its archive instead of making it more accessible and user-friendly. In an email statement to The Verge, the EPA claims that the site’s infrastructure is outdated and that it is no longer “cost-effective.” The agency also said that the public could still access archive material through Freedom of Information Act requests and that most EPA documents will be reviewed on a case-by-case basis for submission to the National Archives and Records Administration. However, these claims are widely criticized, as both means of accessing EPA materials can be time-consuming, confusing, and costly.

The EPA archives have already proven to be essential in places like Camp Lejeune, North Carolina where residents used the online repository to better understand the government’s response to the military’s contamination of surrounding land and water, as well as their own exposure to toxic chemicals. In an era in which the Supreme Court is hampering the government’s ability to regulate pollution and toxic exposure, the archives are also a vital source of information about threatened federal programs. Despite problems with the current archive, it is clear that its closure will result in greater barriers to access, especially, as the American Society for Environmental History notes, among “more marginalized and environmental justice communities.”

 

https://www.selectjustice.com/camp-lejeune-lawsuit

 

While the delay of the archive’s closure was a short-term victory for environmental groups, the EPA has not publicized next steps for the archive. The Internet Archive and other sites like the Policy Commons are continuing to save tens of thousands of documents from the EPA website. Yet both systems have downsides and are not replacements for free and easily-accessible documents through government agencies. As Gretchen Gehrke, co-founder of EGDI, wrote on March 19, “EPA’s archive could become a model of web governance that fosters democratic oversight. Shuttering the archive is moving backwards and is a disservice to the public.”

As we move into an age of greater threats to environmental governance, the EPA should keep the archive open, improve its functionality, and maintain its commitment to transparency and democratic engagement.

— Elena Hight is a writer, educator, activist, and PhD candidate in sociology based in Oklahoma City.

– News Security Beat, July 21, 2022

Filed Under: Environment, Environmental Justice, Newsletter Archives, Quarterly Newsletter

October 17, 2022 by Nukewatch Leave a Comment

Great Lakes Water Protectors They’re Not

By John LaForge
The Granot Loma site is located on the south shore of Lake Superior north of Marquette, Michigan.

A loonie project dubbed “Space Port” is being promoted for the south shore of Lake Superior, the top of the chain of Great Lakes relied upon for drinking water by 40 million people. A group called Michigan Aerospace Manufacturers Association (MAMA) is pushing a rocket launching facility, and is eyeing a spot north of Marquette, on Michigan’s Upper Peninsula. (http://www.michman.org/Michigan-Launch-Initiative). To promote its Michigan Launch Initiative, MAMA has held four “Space Summits” that have featured such well-connected rocket boosters as US Army Lt. Gen. Jos Kellogg (Ret.), Lockheed Martin’s Stacey DeFore, Lt. Gen. Nina Armagnoa of US Space Force, the Federal Aviation Administration, Virgin Orbit, something called “SpaceFund,” Orbion Space Tech., and US Air Force Lt. Gen. David Buck (Ret.). MAMA’s website says it has identified “Loma Farms … as the vertical launch site.” Granot Loma as it’s formally known is a picturesque estate listed in the National Register of Historic Places. Critics with the Upper Peninsula Environmental Coalition and Citizens for a Safe & Clean Lake Superior are fighting any such use of Michigan’s pristine coast because “such an intensely industrial use would damage the ecosystem, endanger public safety, harm the regional recreation-based economy, and severely degrade the quality of life … near Lake Superior’s beautiful south shore.” They report in the newsletter “UPEnvironment” that MAMA has not yet begun its license application for the proposed “vertical launch site” at Granot Loma, so there’s still time to scrap the idiocy. The groups have produced great educational material and even a musical anthem.

— Get information and sign their petition here: https://citizensforasafeandcleanlakesuperior.org/petition/

 

Filed Under: Environment, Environmental Justice, Newsletter Archives, Quarterly Newsletter

October 17, 2022 by Nukewatch Leave a Comment

Holtec Buying Rad Waste as NRC Okays Firm’s New Mexico Storage Site

By Adrian Monty
A map of current storage sites for high-level radioactive waste and spent nuclear fuel in the U.S. (Department of Energy)

 

The radioactive waste-handling conglomerate Holtec International is covering all the bases in its pursuit of a permanent revenue source. It’s not just close to winning a license to build a ground-level dump in southeast New Mexico for highly radioactive waste fuel known as a “consolidated interim storage facility.” The shrewd operators have also purchased a few closed nuclear reactors, guaranteeing Holtec’s own radioactive waste stream — potentially moving nation-wide along highways, railroads, and waterways, as if the storage site had already been approved. Holtec now owns Oyster Creek in New Jersey, Pilgrim in Massachusetts, Indian Point in New York, and both the Palisades and Big Rock Point nuclear stations in Michigan. The NRC has recommended the issuance of a license, after considering Holtec’s Environmental Impact Statement for the project. Of course, the EIS reportedly examined various land use, geologic, public health, socioeconomic, and environmental justice impacts of the plan, and declared all of them “small.” Although the current application is limited, if license amendments are approved later the site could store up to 173,600 metric tons of high-level radioactive waste from the country’s power reactors. The proposed 40-year project life implies that a “permanent” dump site will be found. However, critics say the site will likely become de facto permanent, because there are no plans for a replacement location. Final license approval is expected in early 2023, although the company still faces legal challenges and needs additional permits for construction and transportation of waste across the country.

— Carlsbad Current-Argus & NRC, July 13, 2022; https://holtecinternational.com/products-and-services/hi-store-cis/

 

Filed Under: Environment, Environmental Justice, Newsletter Archives, Nuclear Power, Quarterly Newsletter, Radioactive Waste

October 17, 2022 by Nukewatch 1 Comment

Coverup, not Cleanup, at Santa Susana, California Meltdown Site

By Bob Mayberry

 

Eighteen miles northwest of Hollywood and thirty miles from downtown Los Angeles, high in the Simi Hills, sits a government research site where rocket fuels and nuclear reactors were developed and tested. The Santa Susana Field Laboratory (SSFL), established in 1949 and home originally to Rocketdyne, has been the site of numerous radiation leaks, toxic chemical spills, and one partial reactor core meltdown. The soil on the entire site is toxic, but the responsible parties are doing nothing about it.

In January of this year, the California Department of Toxic Substances Control (DTSC) entered into “non-binding, confidential” negotiations with Boeing, the site’s current owner, which require Boeing to clean up no more than 1% of the contaminants. Under this proposed agreement, or Memo of Understanding (MOU), a panel will be chosen, by Boeing, to set the terms of the cleanup, without public input.

Removing the final hurdle for Boeing, the Los Angeles Regional Water Quality Control Board approved the MOU at their Aug. 11 meeting in Santa Clarita. The Board ignored over 200 activists and residents who opposed it. Daniel Hirsch, retired director of the Program on Environmental and Nuclear Policy at the University of California, Santa Cruz, called the MOU “a tragedy,” adding, “it made effective the larger deal with Boeing to let them have vastly higher levels of contamination in place.” The polluter will be in charge of the cleanup.

Fairewinds Associates’ analysis of soil and dust around the California Woolsey Fire found that the fire “caused radiation from the Santa Susana Field Lab to become airborne and travel as far as nine miles into surrounding communities.” Journal of Environmental Radioactivity published Fairewinds’ paper “Radioactive microparticles related to the Woolsey Fire in Simi Valley, CA.” Graphic by Fairewinds.
Sordid history: meltdowns, spills, and negligence

In 1957, 1971, and 2005, fires at the SSFL caused massive radiation releases and intense radioactive saturation of the soil. In 1959, a catastrophic meltdown of the experimental Sodium Reactor released an estimated 15 to 459 times more radiation than the infamous Three Mile Island meltdown, causing radiation monitoring equipment to go “off-scale,” meaning the radioactivity in the air was too great to measure. The partial meltdown was particularly dangerous because “experimental” reactors lack the typical cement and steel containment structures associated with nuclear reactors like TMI.

For 20 years, the Department of Energy (DOE) successfully covered up the partial meltdown. However, in 1979, UCLA student Michael Rose and Hirsch, his faculty advisor, discovered internal company documentation of the meltdown. Later that year, Rocketdyne officials confirmed the accident.

In 1996, Boeing Corp. purchased Rocketdyne, thereby inheriting responsibility for cleanup of the SSFL. In 2005, Boeing paid restitution to 100 families affected by cancer, but the Santa Susana Advisory Panel estimates up to 1,600 deaths are directly due to radiation exposure from the site.

By 2006, Boeing had violated toxic discharge permits more than eighty times, releasing chromium, dioxin, lead, mercury, and other toxins into Bell Creek, which flows into the Los Angeles River. From 1988-1995 the incidence of cancer within two miles of the SSFL was 60% greater than in the general Southern California population.

In 2007, Boeing, NASA, and the DOE all signed a consent order agreeing to a cleanup. In 2010, NASA and DOE signed additional administrative orders promising to clean up respective portions of the SSFL to standards higher than were agreed to earlier — clean to background radiation levels. However, Boeing did not sign the administrative order and it remains subject to the 2007 consent order — which it has routinely ignored for 14 years.

Boeing’s practice has been cover-up, not cleanup

On November 8, 2018, the Woolsey Fire ignited near the SSFL and burned over 80% of the site in five days. According to Dr. Robert Dodge, president of the Los Angeles branch of Physicians for Social Responsibility, the chemicals on the SSFL site are “incredibly dangerous radionuclides and toxic chemicals … These toxic materials are in [the] SSFL’s soil and vegetation, and when it burns and becomes airborne in smoke and ash, there is real possibility of heightened exposure for area residents.”

Just nine hours after the Woolsey Fire began, the DTSC, charged with protecting “California’s people and environment from harmful effects of toxic substances,” announced that “the fire did not present any risks other than those normally present in a wildfire situation.”

However, three weeks after the fire was contained, independent researchers sampled soil in and around the SSFL and concluded that “site-related radioactive material … escaped the confines” of the SSFL. The most radioactive sample was collected nine miles from the SSFL. Had the 2007 Consent Order been enforced, the site would have been cleaned by the 2017 deadline, and radiation and toxic chemical exposure would not have been among the many dangers posed by the Woolsey Fire. Instead, the continuing presence of toxic substances at the SSFL site made the fire even more dangerous. Meanwhile, government agencies ignore the need for a cleanup and bow to the wishes of a corporation like Boeing.

For updates, see Parents Against Santa Susana Field Lab: https://parentsagainstssfl.com/

— Bob Mayberry is a retired English and Theatre Professor at Cal State University-Channel Islands.

Filed Under: Environment, Environmental Justice, Newsletter Archives, Nuclear Power, Quarterly Newsletter, Radiation Exposure, Radioactive Waste

  • « Previous Page
  • 1
  • …
  • 10
  • 11
  • 12
  • 13
  • 14
  • …
  • 24
  • Next Page »

Stay Connected

  • Facebook
  • Twitter

Subscribe

Donate

Categories

  • B61 Bombs in Europe
  • Chernobyl
  • Counterfeit Reactor Parts
  • Depleted Uranium
  • Direct Action
  • Environment
  • Environmental Justice
  • Fukushima
  • Lake Superior Barrels
  • Military Spending
  • Newsletter Archives
  • North Korea
  • Nuclear Power
  • Nuclear Weapons
  • Office News
  • On The Bright Side
  • Photo Gallery
  • Protect the Water Close Xcel's Monticello Reactor
  • Quarterly Newsletter
  • Radiation Exposure
  • Radioactive Waste
  • Renewable Energy
  • Social Issues
  • Sulfide Mining
  • Through the Prism of Nonviolence
  • Uncategorized
  • Uranium Mining
  • US Bombs Out of Germany
  • War
  • Weekly Column

Contact Us

(715) 472-4185
nukewatch1@lakeland.ws

Address:
740A Round Lake Road
Luck, Wisconsin 54853
USA

Donate To Nukewatch

News & Information on Nuclear Weapons,
Power, Waste & Nonviolent Resistance

Stay Connected

  • Facebook
  • Twitter

© 2026 · Nukewatch