Nukewatch

Working for a nuclear-free future since 1979

  • Issues
    • Direct Action
    • Environmental Justice
    • Nuclear Power
      • Chernobyl
      • Fukushima
    • Nuclear Weapons
    • On The Bright Side
    • Radiation Exposure
    • Radioactive Waste
    • Renewable Energy
    • Uranium Mining
    • US Bombs Out of Germany
  • Quarterly Newsletter
    • Quarterly Newsletter
    • Newsletter Archives
  • Resources
    • Nuclear Heartland Book
    • Fact Sheets
    • Reports, Studies & Publications
      • The New Nuclear Weapons: $1.74 Trillion for H-bomb Profiteers and Fake Cleanups
      • Nuclear Power: Dead In the Water It Poisoned
      • Thorium Fuel’s Advantages as Mythical as Thor
      • Greenpeace on Fukushima 2016
      • Drinking Water at Risk: Toxic Military Wastes Haunt Lake Superior
    • Nukewatch in the News
    • Links
    • Videos
  • About
    • About Nukewatch
    • Contact Us
  • Get Involved
    • Action Alerts!
    • Calendar
  • Donate

April 7, 2025 by Nukewatch Leave a Comment

Nukewatch Spring 2025 Quarterly

Click the links below to access articles from the Spring 2025 Quarterly Newsletter. Page numbers take you to the pdf of each page as they appear in the print version. Individual articles are also tagged by issue category.

Page 1

New U.S. Hydrogen Bombs May Have Arrived at NATO Bases in Europe, Air Force Hints at Endless Production

The Lies Have It: Xcel Energy Wins Operating Extension for Nation’s 6th Oldest Nuclear Reactor

Minnesota Legislature Considers Repeal of Nuclear Moratorium

Page 2

Welcome to Planet Vogtle: The Lessons of Georgia’s Nuclear Boondoggle

Page 3

Three Declarations of Genocide and the U.S. Responses

Raytheon Pushes Doomsday Clock Closer to Midnight

Page 4 

Federal Law Violations, Anti-democratic Process in Preparing for New Plutonium Weapon Cores

Page 5

Fukushima Pollution Solution: Spread Radioactivity Far and Wide

Page 6

Boondoggle Boost to Military Budget Busting

Nuclear and Fossil Fuels Research and Development Given over Five Times More Funding

Italian Bank Chief: Weapons Building is “Development in Reverse”

New Nukewatch Staff Member

Members of New Coalition Educate Minn. Public Utility Commissioners at Hearing

New Facility for Navy Nuke Waste at Idaho  National Lab Overbudget and Behind Schedule

Iran’s Ayatollah Khamenei Renews Prohibition against Nuclear Weapons

Daft Trump Officials Fire/Rehire Nuclear Weapons Staff Unaware They Oversee U.S. Arsenal

Will DOE Shirk Proper Clean-up of Santa Susana Field Lab?

Page 7

U.S. Anti-War/Anti-Poverty Activist Ends 7.5-Month Prison Term in Germany

Page 8

Seven Reasons Why Nuclear Energy is Not the Answer to Solve Climate Change

Filed Under: Newsletter Archives, Quarterly Newsletter

April 7, 2025 by Nukewatch Leave a Comment

New U.S. Hydrogen Bombs May Have Arrived at NATO Bases in Europe, Air Force Hints at Endless Production

By John LaForge

The transfer of new U.S. nuclear bombs to air bases in Europe as part of the quaint-sounding “nuclear sharing” program seems to have been confirmed by Administrator of the National Nuclear Security Administration, Jill Hruby.

In remarks to the Hudson Institute on January 16, Hruby said, “The new B61-12 gravity bombs are fully forward deployed, and we have increased NATO’s visibility to our nuclear capabilities.”

Hruby’s announcement came just a week after the National Nuclear Security Administration (NNSA) revealed that production of the U.S.’s newest thermonuclear gravity bombs was complete. “In December 2024, the B61-12 life extension program … finish[ed] its production run,” the Eurasian Times reported on January 18.

NNSA’s notification came only three days after Hans Kristensen, et al. reported in the Bulletin of the Atomic Scientists, “[I]t remained unclear whether any B61-12s had been delivered to European bases.” Hruby’s surprisingly rare public declaration prompted Kristensen, of the Federation of American Scientists, to tell Eurasian Times, “This almost sounds like official confirmation that deployment of the B61-12 to Europe has begun.”

Despite resistance to illegal U.S. nuclear weapons, new hydrogen bombs may already have arrived at NATO bases. Photo: Campaign for Nuclear Disarmament.

That Hruby’s announcement was “almost like” official confirmation is about as much openness as the public ever gets regarding the highly secretive world of nuclear weapons. Only an eye-witness account of the arrival of a giant U.S. Air Force C-17 cargo plane at any of six NATO “nuclear sharing” bases — in Germany, Italy, Belgium, and the Netherlands — could be a more certain affirmation.

In preparation for the delivery of the new air-drop thermonuclear gravity bombs, the foreign air force bases have all undertaken major, costly upgrades and expansions. The Bulletin reports, “these upgrades include the installation of double-fence security perimeters, modernizing the weapon storage and security systems and the alarm communication and display systems….” In addition, “A loading pad designed for U.S. C-17 aircraft that transports nuclear weapons is also being added at Kleine Brogel (Belgium), Büchel (Germany), Ghedi (Italy), and Volkel (the Netherlands).”

The approximately $1.14 billion Büchel Air Base upgrade also makes way for the new F-35 Stealth jet fighters being purchased by Germany to be flown by German Air Force pilots who will continue their role as planners, preparers, and prospective executioners of nuclear weapons attacks aimed at Russia.

News of the likely transfer of the new B61-12s came just as a group of nuclear weapons opponents were gathering only 15 miles from Germany’s Büchel Air Base, south of Cologne. The anti-nuclear group Nonviolent Action for Abolition met to welcome out of prison the U.S. nuclear resister Susan Crane, who had served 230 days resulting from protests at the base, and to discuss the coming year’s schedule of events which are directed against “nuclear sharing” in general and Büchel’s collaboration in particular. The NNSA’s January 18th B61-12 “job done” announcement included the thrilling, career saving and budget retaining news that its 60-year-old bomb-building assembly line “will transition to producing the B61-13 bomb.”

The Bulletin noted more soberly that the B61-version 13 comes with a thermonuclear explosive force of 360 kilotons, “significantly higher than the B61-12’s yield of 50 kilotons.”

With 24 Hiroshima-sized firestorms in each new “13,” you could say this jobs program has “unlucky” written all over it. Yet there is evidently no thought of arms control or belt-tightening when it comes to mass production of this Ford Mustang of mass destruction. The War Zone online reports this month that, “The B61-13 and future variants will require highly specialized engineering … the U.S. Air Force’s Nuclear Weapon Center’s recent contracting notice said.” (emphasis added).

Yes, contracting is the thing. And you thought it was about deterrence.

Filed Under: B61 Bombs in Europe, Newsletter Archives, Nuclear Weapons, Quarterly Newsletter

April 7, 2025 by Nukewatch Leave a Comment

The Lies Have It: Xcel Energy Wins Operating Extension for Nation’s 6th Oldest Nuclear Reactor

By John LaForge

I.F. Stone famously said, “All governments are run by liars and nothing they say should be believed.” The aphorism applies equally well to nuclear reactor operators, including Minneapolis based Xcel Energy.

The U.S. Nuclear Regulatory Commission (NRC) has granted Xcel a second license extension for operating its 53-year-old Monticello reactor on the Mississippi River in Minnesota. The decision will permit this General Electric jalopy, a Fukushima clone, to run until it’s 80 years old — a dangerous feat that’s never been done in the history of nuclear power. The NRC received over 3,000 public comments mostly critical of the extension, but the commission has rubber-stamped 87 of 92 similar requests, so call the NRC “Never Really Concerned.”

The NRC nod is based partly on the commission’s Final Environmental Impact Statement (EIS) for the re-licensing, even though the document confirms that Xcel repeatedly made false statements about its massive 2022-23 leak of radioactive cooling water. According to a March 16, 2023, Associated Press (AP) story, Xcel’s first public response to the major leak was, “There’s no danger to the public.” Xcel then proceeded to understate by more than half the leak’s actual volume, estimating it was only 400,000 gallons.

Xcel eventually acknowledged that the volume of the leak, from an old corroded underground pipe, was 829,000 gallons, and that the groundwater plume of reactor cooling water — some of which would later reach the Mississippi River — had a radioactive footprint of some fourteen curies of tritium — a very large amount. (For reference, the 1979 partial reactor meltdown at Three Mile Island released an estimated 15 curies of gaseous radioactive iodine-131 to the Pennsylvania atmosphere. Other radioactive materials went into the Susquehanna River.)

Xcel’s 829,000-gallon leak was always a direct threat to drinking water because — as the company’s own 2023 Annual Radioactive Effluent Release Report states on page 13 — “It is assumed groundwater continuously flows to the river…” The Mississippi is the drinking water source for 20 million people, including Minneapolis, St. Paul, and their surrounding suburbs 37 miles downstream from the leaky reactor.

The extension will allow the Monticello reactor to operate until it’s 80 years old.

The fact that Xcel’s radioactive groundwater plume would automatically move toward the Mississippi meant the leak posed a gargantuan public relations problem. Lying about it was Xcel’s and the NRC’s first action. One NRC spokesperson, Victoria Mitlyng, told WCCO TV News, March 17, 2023, “There is no pathway for the tritium to get into drinking water.”

This mis-step was so blatant that, following pressure from Nukewatch, NRC Senior Environmental Project Manager Stephen S. Koenick publicly apologized for the fudge, at an NRC open meeting in the city of Monticello, May 15, 2024. Koenick told the gathering, “I know we had meetings in which we reported there were no indication[s] of a tritium leak making it to the Mississippi. However, in our Draft Environmental Impact Statement, we do say, we do conclude there were some very low concentrations of tritium in the Mississippi River.”

Curies and picocuries: code language helps to confuse

When these radioactive accidents take place, public relations language is employed by the industry to confuse, befog, and try to trivialize their size, scope, and potential health and environmental effects. Xcel reported to the NRC Dec. 15, 2022 that its leaked cooling water contained 5,020,000 “picocuries of radioactive tritium per liter,” sometimes written as “picocuries/liter.” This concentration is 251 times the EPA’s allowable limit for drinking water.

A picocurie is one-trillionth of a curie. Anything in the world divisible by one trillion is naturally very large, and a curie is a very large cache of radioactivity indeed. One curie amounts to 37 billion atomic disintegrations-per-second.

The NRC’s final EIS states on page 3-48, “Monticello reported an abnormal discharge to the Mississippi River from tritium contaminated groundwater of 0.167 curies of tritium between 07/27/23 and 12/31/23….”

The figure “0.167 curies” may give the impression of a small amount, but this amount of tritium contamination leaked to the Mississippi translates to 167 billion picocuries. Again, 20,000 picocuries-per liter is the current EPA allowable drinking water limit.

Over seven million gallons of groundwater has been pumped from Xcel’s onsite wells to try and keep more tritium from reaching the Mississippi. The final EIS says about this pollution at page 3-206 “For the period from January 1, 2023 to December 31, 2023, a total of 0.388 Ci [curies] of tritium (released via natural evaporation from the temporary tanks and the groundwater remediation pond) was reported during calendar year 2023.” This is to say 388 billion picocuries of tritium were sent floating around Minnesota’s Wright and Sherburne counties. This underreported and unplanned, emergency stop-gap response poses some risk for the surrounding residents who breathe.

Xcel’s estimated leak of 14 curies of tritium will contaminate the moving groundwater for a very long time. Its radioactive half-life is 12.3 years, so the tritium will persist for about 12 decades while it decays to helium-3 (radioactive substances are considered hazardous for ten half lives). Once tritium contaminates water, it is impossibly expensive to remove. A new textbook on tritium reports, “its half-life is short enough that it is extremely radioactive. For a given mass, it is, for instance, about 150,000 times as radioactive, in terms of disintegrations per unit time, as plutonium-239. One teaspoon of tritiated water would contaminate about 100 billion gallons of water to the U.S. drinking water limit.”

Alarmingly, when tritium is internalized (ingested or inhaled) it can result in problem pregnancies, miscarriages, and birth abnormalities because this machine-made radioactive poison crosses the placenta where it threatens the fetus. Yet the NRC has neither imposed a penalty nor even issued a rebuke to Xcel for its enormous leak or for its public lying that still paints a false picture of its consequences.

Xcel’s home website seen Jan. 8, 2025 still includes the uncorrected notice of March 16, 2023 that claims, “Xcel Energy took swift action to contain the leak to the plant site, which poses no health and safety risk to the local community or the environment,” and in the next paragraph it still says, “the leaked water is fully contained on-site and has not been detected beyond the facility”. Of course, Xcel knows that nothing “contains” groundwater which is constantly moving willy-nilly. This company’s public pronouncements must not be believed.

The Coalition for a Nuclear-Free Mississippi River, made up of regional environmental, climate, and justice groups has vowed to see the reactor closed before the achy, breaky Monticello unit causes a more catastrophic radiation release.

— John LaForge and the Coalition for a Nuclear-Free Mississippi River, Lindsay Potter contributed research to this report.

Filed Under: Environment, Newsletter Archives, Nuclear Power, Quarterly Newsletter

April 7, 2025 by Nukewatch 1 Comment

Minnesota Legislature Considers Repeal of Nuclear Moratorium

By Lindsay Potter

Bills are circulating in the Minnesota legislature to repeal the state’s 31-year-old moratorium on building new nuclear reactors. Members of the Nukewatch and the Coalition for a Nuclear-Free Mississippi River testified before committees in the House and Senate and are collaborating with the Rise and Repair Alliance to oppose the repeal. Now is the time for Minnesota residents to write, email, and call state legislators: urge them to oppose the repeal. As the Nukewatch Quarterly has emphasized again and again, nuclear power cannot aid in confronting the climate crisis — it is simply too costly and too slow. (See Welcome to Planet Vogtle: The Lessons of Georgia’s Nuclear Boondoggle and Seven Reasons Why Nuclear Energy is Not the Answer to Solve Climate Change.)

Nuclear electricity costs about 3-14 times that of onshore wind, takes 7 to 21 years longer between planning and operation than wind, and produces 9 to 37 times the emissions as wind. Nuclear creates risk and cost associated with nuclear weapons proliferation, meltdowns and accidents, the uranium fuel chain, radiation health risks, radioactive waste, threats to vital water sources, and environmental racism.

Nuclear power has received four times more federal funding for research and development over the last 70 years than renewables and is still the most expensive energy option. The U.S. Energy Information Agency’s 2024 comparison of energy sources calculated that nuclear power costs three to four times more than the combination of renewable wind and solar power plus back-up batteries. This does not include the cost of meltdowns or accidents, or the cost of packaging and storing radioactive waste, which must be isolated from the environment for hundreds of thousands of years.

So far, the only U.S. long-term waste storage project, at Yucca Mountain, Nev., had a projected total cost of $96 billion, took 18 years and wasted $8 billion before being cancelled as scientifically unviable. Canada has proposed a waste site 90 miles northeast of Minnesota’s Voyageurs National Park and 150 miles north of the Boundary Waters Canoe Area Wilderness.

Prospective small modular reactor (SMR) technology has yet to produce a single commercial reactor in the U.S., and the first licensed project folded after costs soared. Like large reactors, SMRs produce radioactive waste and suffer the same climate-worsening construction times and cost overruns.

Leading experts have shown we do not need nuclear to reach 100% renewable energy in Minnesota — this can be done with wind, solar, and battery storage. Research has shown batteries can meet demand fluctuations more effectively than nuclear.

Visit nukewatchinfo.org/protect-minnesotas-nuclear-moratorium/ to find template letters and how to contact legislators.

Filed Under: Environment, Newsletter Archives, Nuclear Power, Protect the Water Close Xcel's Monticello Reactor, Quarterly Newsletter

April 7, 2025 by Nukewatch Leave a Comment

Welcome to Planet Vogtle: The Lessons of Georgia’s Nuclear Boondoggle

By Stephen Wing

A global race is on to see who will host the next nuclear disaster, and as always the U.S.A. is determined to take the lead. On June 18, 2024 the Senate passed the so-called ADVANCE Act, pledging billions of taxpayer dollars to the most expensive, inefficient, and toxic form of energy ever devised. Thanks to the $37 billion expansion of Vogtle Nuclear Station, Georgia Power ratepayers like me know what is ahead: record-breaking profits for utility companies, record-breaking power bills for the rest of us.

Lavish federal subsidies under the last four presidents and a grandiose “nuclear renaissance” public relations campaign have failed to reverse decades of decline for nuclear energy.

No surprise — it’s an obsolete, dangerous, and financially untenable technology that no private investor or insurance carrier will touch.

But now, like the Four Horsemen of the Apocalypse, what Naomi Klein calls “disaster capitalism” comes galloping to the rescue. A rare bipartisan consensus hails “clean, safe nuclear energy” as the answer to climate change. The 93-page ADVANCE Act —cleverly concealed within the three-page text of the Fire Grants Safety Act — delivers the entire wish list of the nuclear industry. Only Bernie Sanders and Ed Markey voted “no.” Liberal icon Sheldon Whitehouse actually helped draft the legislation.

Calling nuclear power “clean” and “safe” would be laughable if it weren’t such a grim joke. Radioactive contamination plagues it at every step, from carcinogenic uranium mining to routine radionuclide releases at every operating reactor, to the mounting backlog of radioactive waste. “Disposal” is a euphemism; the waste will remain deadly for tens of thousands of years, longer than the entire history of civilization, with no safe storage option in sight. [“Abandonment” is the word Dr. Gordon Edwards uses.]

Expecting nukes to help slow global warming is equally deluded. The two new reactors at Vogtle — the nation’s first since the Three Mile Island meltdown in 1979 — took 15 years to construct, double the original estimate. We would have to build 1,400 more within ten years to noticeably impact the pace of climate change. Developing untested technologies such as “small modular nuclear reactors” will take decades longer.

The ADVANCE Act greases the tracks by eliminating regulatory barriers, essentially transforming the Nuclear Regulatory Commission from a safety watchdog into an industry booster. It curtails the licensing process, downgrades health and safety standards, and promotes the export of nuclear technology. The U.S. can now compete with Russia and China to spread “nuclear waste factories” like Vogtle around the globe.

The NRC ever seriously hindered the industry it is charged to regulate. The new legislation comes amid a nationwide rush to extend the licensing of nuclear reactors from their estimated safe lifespan of 40 years to 60, 80, even 100 years, despite the proven tendency of radioactivity to “embrittle” the concrete and metals that shield us from exposure.

Though media coverage of the ADVANCE Act was largely clueless, several outlets quoted a statement by Ed Lyman of the Union of Concerned Scientists: “Make no mistake: This is not about making the reactor licensing process more efficient, but about weakening safety and security oversight across the board, a longstanding industry goal.”

The only reason utilities are pushing nukes — and the only reason they ever did — is profit. Ever since Eisenhower heralded “the peaceful atom” and the industry promised energy “too cheap to meter,” nuclear power has depended entirely on government subsidies to survive. By far the costliest way to generate electricity, it’s also the most profitable, since we the taxpayers cover most of the costs, from uranium mining and enrichment to managing radioactive waste, to the uninsurable consequences of catastrophic accidents.

Betting on nukes not only wastes irrecoverable time and money; it preempts real solutions. Investing the same tax dollars in renewables like solar and wind, energy-efficient retrofits, and upgrading the power grid would displace far more carbon emissions. Renewables already provide more electricity globally than nukes, are far cheaper per kilowatt-hour, and can be expanded much more rapidly while generating exponentially more jobs.

Given escalating threats of extreme weather and terrorism, declining safety standards, and the industry’s eagerness to sell its radioactive snake-oil to developing nations, the odds of another deadly meltdown somewhere in the world approach the threshold of inevitability.

On the eve of Georgia Power’s triumphant ribbon-cutting for its new reactors, six environmental and consumer groups released “Plant Vogtle: The True Cost of Nuclear Power in the United States,” a 35-page report exposing the political maneuvering and cynical profiteering that made the project a “success.”

The story begins in 2009, when most U.S. utilities had abandoned the “nuclear renaissance” due to plunging natural gas prices, zero growth in energy consumption, and the astronomical cost of nuclear reactors. Despite federal loan guarantees, no one was investing — until the Georgia General Assembly solved the problem with a bill allowing Georgia Power (a subsidiary of Southern Company) to charge customers a monthly fee to finance two additional reactors at Vogtle Nuclear Station, near Augusta.

Georgia Power’s sales had been flat for two decades and its generating capacity was nearly three times the reserves recommended by the federal agency in charge of our national grid. So why would the company build two expensive, unnecessary new reactors? And why would Georgia’s elected utility regulators, the Public Service Commission, allow it?

The four reactors at Vogtle power station in Georgia: “the most expensive power plant ever built on Earth.” Photo: georgiawatch.org

“By all appearances,” the report explains, “the Georgia PSC is deep in regulatory capture, a phenomenon where a regulator prioritizes the interests of the companies it regulates (like Georgia Power) over the public good…. Since Georgia Power is a monopoly and operates outside of a competitive business market, it can shift risks and costs ontocustomers if regulator or legislative bodies enable it. That is exactly what the Georgia PSC did.”

Adding as much as 10% to a typical power bill, the fees raised over $4 billion — 88% of it from residential customers, small businesses, even public schools, and only 11% from major industries, thanks to some canny lobbying. The average household ended up paying about $1,000 upfront to subsidize the reactors. The U.S. Treasury contributed a $12 billion low-interest loan, and the rest of the upfront cost came from other lenders.

But Georgia law guarantees that ratepayers must cover loan repayment along with Georgia Power’s other costs — which the PSC repeatedly approved as the budget jumped from an initial $14 billion to $21, then to $27 billion.

In effect, ratepayers and taxpayers were forced to shoulder the entire investment, while the profits go to Southern Company shareholders. That same year, South Carolina authorized a similar customer fee to expand its VC Summer nuclear station. Both projects were contracted to Westinghouse. Construction began in 2013, but according to the report, “Cost overruns at both reactor sites began immediately, and by early 2017 were so extreme that Westinghouse declared bankruptcy.” In South Carolina, an investigation led to criminal charges against Westinghouse and utility executives, four of whom went to prison and paid steep fines “for lying about the costs and progress of the project.”

“Similar behavior by Westinghouse and Georgia Power/Southern Company officials occurred in Georgia,” the report goes on, “but there has been no accountability…. Commissioners repeatedly accepted Georgia Power’s budget and schedule forecasts in defiance of documented evidence from the Commission’s own staff and consultants that they were materially inaccurate for over ten years.” The PSC also praised the company and nuclear power itself with evangelical fervor, violating state regulations that require neutrality in upholding the public interest.

The two reactors ultimately cost over $36.85 billion, making Vogtle “the most expensive power plant ever built on Earth.” But because the PSC approved an exceptionally high rate of “return on equity,” every cost overrun and construction delay only bolstered Georgia Power’s profits. “Georgia Power was making substantially greater profits from Vogtle 3 and 4’s delay than if it had finished on schedule,” the report says.

“Indeed, commissioners allowed Georgia Power to amass a record $17 billion in profits between 2009 and 2023, while allowing $20 billion in cost overruns for Vogtle 3 and 4.”

In December 2023, the PSC voted to saddle ratepayers with $11.1 billion in cost overruns, often caused by shoddy workmanship, inept management, and poor design. Vogtle-related rate increases will eventually total 23.7% — “in stark contrast,” the report points out, “to claims Georgia Power made in 2016 that completing Vogtle units would put ‘downward pressure on rates.’ . . . It is very likely Georgians will soon be paying the highest power bills in the nation due to Plant Vogtle.”

The report’s conclusion illuminates the deceptive premises of the ADVANCE Act:

“Fossil fuels and uranium are burned to boil water to produce steam to generate electricity which produces large amounts of waste heat. Renewable energy not only does not produce waste heat, but is more than twice as efficient as steam generated power, thus fossil fuel and nuclear energy can be replaced by less than half as much clean, renewable energy . . .”

“Washington, Oregon, Idaho, and South Dakota produced over 60% of their electricity from renewables in 2023, and ten countries generated 60 to 90% of their electricity from renewables in 2022 including Scotland, Iceland, the Netherlands, Germany, and Guatemala, among others. California’s output from wind, water and solar power exceeded demand for 30 of 38 days early in 2024 . . .”

“Investments in a clean energy transition would save substantial amounts of ratepayer money, and would quickly meet the reduced greenhouse gas emissions reduction targets the world needs to address the climate crisis. Yet these investments are not made as they are not as profitable for monopoly utilities seeking to maximize profits. . . . An immense transfer of wealth is taking place from the people of Georgia to a rich, powerful monopoly whose only motivation is to maximize profits.”

On behalf of “the people of Georgia,” I hope citizens of other states are paying attention. You can download the full report here: truthaboutvogtle.com.

— Stephen Wing is a board member with Nuclear Watch South, co-producer of the report.

Filed Under: Environment, Environmental Justice, Newsletter Archives, Nuclear Power, Quarterly Newsletter

  • « Previous Page
  • 1
  • …
  • 20
  • 21
  • 22
  • 23
  • 24
  • …
  • 223
  • Next Page »

Stay Connected

  • Facebook
  • Twitter

Subscribe

Donate

Categories

  • B61 Bombs in Europe
  • Chernobyl
  • Counterfeit Reactor Parts
  • Depleted Uranium
  • Direct Action
  • Environment
  • Environmental Justice
  • Fukushima
  • Lake Superior Barrels
  • Military Spending
  • Newsletter Archives
  • North Korea
  • Nuclear Power
  • Nuclear Weapons
  • Office News
  • On The Bright Side
  • Photo Gallery
  • Protect the Water Close Xcel's Monticello Reactor
  • Quarterly Newsletter
  • Radiation Exposure
  • Radioactive Waste
  • Renewable Energy
  • Social Issues
  • Sulfide Mining
  • Through the Prism of Nonviolence
  • Uncategorized
  • Uranium Mining
  • US Bombs Out of Germany
  • War
  • Weekly Column

Contact Us

(715) 472-4185
nukewatch1@lakeland.ws

Address:
740A Round Lake Road
Luck, Wisconsin 54853
USA

Donate To Nukewatch

News & Information on Nuclear Weapons,
Power, Waste & Nonviolent Resistance

Stay Connected

  • Facebook
  • Twitter

© 2026 · Nukewatch