Nukewatch

Working for a nuclear-free future since 1979

  • Issues
    • Direct Action
    • Environmental Justice
    • Nuclear Power
      • Chernobyl
      • Fukushima
    • Nuclear Weapons
    • On The Bright Side
    • Radiation Exposure
    • Radioactive Waste
    • Renewable Energy
    • Uranium Mining
    • US Bombs Out of Germany
  • Quarterly Newsletter
    • Quarterly Newsletter
    • Newsletter Archives
  • Resources
    • Nuclear Heartland Book
    • Fact Sheets
    • Reports, Studies & Publications
      • The New Nuclear Weapons: $1.74 Trillion for H-bomb Profiteers and Fake Cleanups
      • Nuclear Power: Dead In the Water It Poisoned
      • Thorium Fuel’s Advantages as Mythical as Thor
      • Greenpeace on Fukushima 2016
      • Drinking Water at Risk: Toxic Military Wastes Haunt Lake Superior
    • Nukewatch in the News
    • Links
    • Videos
  • About
    • About Nukewatch
    • Contact Us
  • Get Involved
    • Action Alerts!
    • Calendar
  • Donate

July 23, 2024 by Nukewatch Leave a Comment

NRC Froze Data Gathering Same Day Tritium Tests Near Mississippi River Topped Drinking Water Limits

By Nukewatch Staff

To prepare its Draft Environmental Impact Statement (DEIS) regarding Xcel Energy’s license extension application for its Monticello reactor, the Nuclear Regulatory Commission had to establish a formal information-gathering period. The data collection time-frame officially ended on August 18, 2023.

According to Xcel Energy and NRC documents reviewed by Nukewatch, the NRC seems to have coincidentally picked for its end date the very day that radioactive tritium contamination in a groundwater test well near the Mississippi River exceeded the federal EPA safe drinking water limit.

In Xcel’s December 18, 2023 response to an NRC information request on its relicense application, Xcel submitted a table documenting the results of monitoring well tests between November 21, 2022 and August 18, 2023. Xcel’s table notes that the level of tritium in monitoring well (MW)-37A between July 27, 2023 and August 18, 2023 grew five-fold until, on August 18, it exceeded the EPA safe drinking water limit of 20,000 pico-curies-per-liter (pCi/L).

The NRC is currently considering Xcel’s application for a second 20-year license extension which, if granted, would allow the Monticello reactor in Minn., to run until 2050, when it would be 80 years old.

The classic Scream, by Edvard Munch, visits the Monticello nuclear reactor.

The NRC’s data collection cut-off date omits the critical time-frame immediately after August 18, when tritium levels near the Mississippi River were still increasing.

Similarly, Xcel’s “2023 Annual Radioactive Effluent Release Report” fails to provide precise data on monitoring well test results following August 18, 2023, noting only in general terms that tests done after that date found no unsafe levels of contamination. “The NRC should demand that Xcel provide well test results from August 18, 2023, through December 31, 2023, and should then enter these into the Federal Register for public consideration,” said Nukewatch’s Lindsay Potter, who discovered the coincidence. “The DEIS and license renewal process is incomplete without this information and should not move forward without it,” she said.

The reactor caused a leak to onsite groundwater of some 829,000 gallons of tritium-contaminated cooling water beginning in November 2022. In the same reply to the NRC December 18, 2023, Xcel reported that it had doubled its estimated volume of tritium-contaminated cooling water that had leaked to 829,000 gallons, not 400,000 gallons as it first reported.

The NRC acknowledges in its DEIS: “From available sampling data … tritium activity in wells MW-29A and MW-37A, which are near the river, were above the 20,000 pCi/L drinking water standard and trending in an upward direction as of August 2023.”

Tritium is a radioactive form of hydrogen — impossible to remove from water — which crosses the placenta and can cause cancer if ingested or inhaled.

Filed Under: Environment, Environmental Justice, Newsletter Archives, Nuclear Power, Protect the Water Close Xcel's Monticello Reactor, Quarterly Newsletter, Radiation Exposure

July 23, 2024 by Nukewatch Leave a Comment

5th Circuit Vacates Holtec Rad Dump License

The U.S. Court of Appeals for the 5th Circuit, in New Orleans, on March 27, 2024, issued a ruling vacating the license for the construction and operation of Holtec International’s consolidated interim storage site in New Mexico. The U.S. Nuclear Regulatory Commission had approved the license in May 2023 to store up to 173,600 metric tonnes of irradiated reactor fuel and other highly radioactive waste. An August 2023 challenge to a similar Interim Storage Partners (ISP) dump in Texas also prevailed. The two dumps are only 40 miles apart, on either side of the New Mexico/Texas state line.

A six-group grassroots environmental coalition, including Beyond Nuclear, Don’t Waste Michigan, and Sierra Club, brought their argument against ISP before a 3-judge panel of the D.C. Circuit and were ruled against in January 2023. The same coalition tried once more on March 5 and is awaiting a ruling. Petitioners contend that the Holtec license violates the Nuclear Waste Policy Act and other federal laws. Opening the Holtec facility would trigger unprecedented numbers of shipments of highly radioactive waste reactor fuel across the country. The court’s ruling in the case could prevent the shipments and set a precedent for the disposal of high-level radioactive waste.

— Excerpted from Beyond Nuclear, March 27, 2024

Filed Under: Environment, Environmental Justice, Newsletter Archives, Nuclear Power, Quarterly Newsletter, Radioactive Waste

July 23, 2024 by Nukewatch Leave a Comment

Biden Approves Extension of Price-Anderson Act

On March 23, 2024, out of the public view and without a single hearing, both chambers of Congress passed legislation and the White House signed into law, the renewal of the Price-Anderson Act (PAA) that extends and expands the nuclear industry’s limited liability protection to the next severe accident by forty years until December 31, 2065. The PAA financially shields the nuclear industry that otherwise would never have built its first reactor.

While the [estimated] cost of nuclear accidents at Chornobyl and Fukushima have exceeded hundreds of billions of dollars, the current PAA limits the

theragblog.com

U.S. industry’s collective liability to just over $16 billion per accident — leaving federal taxpayers liable for the remaining compensation costs. Let’s remember, the U.S. government has yet to provide compensation to downwind U.S. citizens, still sickened and dying of cancer caused by the first atomic bomb “test” (Trinity) on July 16, 1945.

The PAA renewal is the most dramatic demonstration that the nuclear industry and its deluded champions have “no confidence” in their own cynical promotional rhetoric.

— Excerpted from Beyond Nuclear, March 27, 2024

Filed Under: Environment, Environmental Justice, Newsletter Archives, Nuclear Power, Quarterly Newsletter

July 23, 2024 by Nukewatch Leave a Comment

“Gigantic Subsea Nuclear Graveyard”

By Lindsay Potter
telegraph.co.uk

The United Kingdom is considering an unprecedented deep-sea Geological Disposal Facility (GDF) under the sea floor for high-level radioactive waste, currently estimated to cost $83 billion and take 150 years to build — making it the “biggest, longest-lasting, and most expensive infrastructure project ever undertaken in the U.K.,” according to the London Telegraph. The GDF would be a 3,500-foot-deep shaft with multiple tunnels to be filled and then sealed with cement. The London Telegraph reports that the shaft would connect to “huge vaults … excavated in the impermeable clays … scientists hope could provide a last resting place for Britain’s nuclear legacy.” The proposed sites are off the coast of Lincolnshire or off the coast of Cumbria, both areas dependent on tourism.

Professor of Energy Policy at Greenwich University Dr. Steven Thomas said, “these [cost] estimates are no more than a wild guess.” For now, contractor Nuclear Waste Services Co. (NWS) anticipates storing 26 million cubic feet of waste — 750,000 cubic feet are currently awaiting burial and the rest is estimated waste to be accumulated by the U.K.’s next generation of nuclear reactors. The waste includes 110,000 tons of uranium and 120 tons of plutonium. Uranium-238 takes 4.5 billion years for half to decay. Neil Hyatt, NWS’s chief scientific advisor, points out the waste will be deadly likely beyond the end of our civilization. “We’re talking about a piece of infrastructure that’s going to go with us on a journey into the future, for as far forward [in time] as homo sapiens has existed,” he said. Claire Corkhill, professor of radioactive waste management at Bristol University, who is also a member of the Government’s advisory Committee on Radioactive Waste Management, said, “We owe it to future generations to ensure that we have a solution for the radioactive waste generated from new nuclear power stations before we start producing it.”

— Le Show, May 12; electricityinfo.org, May 6; London Telegraph, May 5, 2024

Filed Under: Environment, Environmental Justice, Newsletter Archives, Nuclear Power, Quarterly Newsletter, Radioactive Waste

July 23, 2024 by Nukewatch 1 Comment

Canadians Fight Dump Near Ottawa River

The Chalk River site. Image: The Council of Canadians. Learn more at stopnuclearwaste.com.
By Lindsay Potter

In January, the Canadian Nuclear Safety Commission amended the operating license for the Canada Nuclear Laboratories’ (CNL) Chalk River site authorizing construction of a “near surface disposal facility” to hold one million cubic meters of radioactive waste one kilometer from the Ottawa River, drinking water source for more than ten million people. The proposed NSDF is seven stories high and larger than 70 NHL hockey rinks.

The “low-level radioactive waste” destined for burial includes contaminated building materials, soil, equipment, tools, etc. The site, near Deep River, Ontario, upriver from Ottawa and Montreal, is unceded Anishinabeg Algonquin Nation territory. The Ottawa River has been a sacred and vital waterway for First Nations for thousands of years.

The NSDF is described as an “earthen mound” containing twelve disposal “cells,” each to be lined and covered. The proposal also includes systems for collecting leachate, detecting leaks, monitoring, as well as other infrastructure for treating wastewater and cleaning trucks, workstations, and personnel.

Once construction is finished, the commission must grant CNL an additional license before it begins burying radioactive waste in the facility. The NSDF is projected to operate for 50 years, followed by a 30-year “closure phase” and a 300-year “post-closure phase,” wrapping up in 2400.

The commission says the project “is not likely to cause significant adverse environmental effects,” but there is already a long list of radioactive contamination at the site, affecting the groundwater, tributaries — including Perch Lake and Perch Creek — and wetlands that feed into the Ottawa River. The licensing process has been riddled with complexities.

Opposition by First Nations, Environmentalists, and Other Local Leaders

Of the eleven Algonquin groups in the area, ten expressed strong opposition to the NSDF, citing concerns for the safety of the waters of Kichi Zibi (the Algonquin name for the Ottawa River), health risks to people and wildlife, violation of treaty obligations and sacred sites, lack of prior and informed consent, and industry influence over the commission.

Dozens of mayors with the Montreal Metropolitan Community as well as 140 other municipalities in Ontario and Quebec oppose the project. Maja Vodanovic, mayor of the Lachine borough in Montreal, told CBC News, “Nuclear energy is not clean energy … Yes, it doesn’t produce the [same] greenhouse gas effects like oil, but it creates very dangerous waste.” The Canadian Museum of Nature also denounced the NSDF over concerns it could harm two endangered species living in the watershed.

Though the commission maintains it consulted Indigenous groups in accordance with requirements under Canadian and international law, Algonquin leaders are pursuing further legal action, citing treaty violations. Lance Haymond, chief of Kebaowek First Nation, told CBC, “We are very fearful that in 10, 15, 20 years, this project will continue to pose a risk … to all Canadians who use and depend on the Ottawa River as their drinking water source.”

Chief Dylan Whiteduck of Kitigan Zibi Anishinābeg First Nation told CBC, “They always knew they wanted to do this and they were going to do it with or without us.” Justin Roy of Kebaowek First Nation said, “When building a camp and you need potable drinking water and you build a well, you don’t go and build your outhouse beside that well.”

Industry Inside Job

The Canadian Nuclear Safety Commission, charged with determining the NSDF’s safety and granting its operating license, claims it “is an independent administrative tribunal set up at arm’s length from government, without ties to the nuclear industry.” But five of the Commission’s six members have unabashed ties to the nuclear industry.

— CBC News Jan. 11, 2024, Oct. 24, 2023; Canadian Nuclear Safety Commission

Look for Part Two of this story in the upcoming Nukewatch Fall Quarterly. Learn about the fraudulent multi-nationals set to run the project, the radioactive legacy left by decades of nuclear work at Chalk River, its links to the Manhattan Project, and the next steps forward for opposition groups.

Filed Under: Environment, Environmental Justice, Newsletter Archives, Nuclear Power, Nuclear Weapons, Quarterly Newsletter, Radioactive Waste

  • « Previous Page
  • 1
  • …
  • 4
  • 5
  • 6
  • 7
  • 8
  • …
  • 24
  • Next Page »

Stay Connected

  • Facebook
  • Twitter

Subscribe

Donate

Categories

  • B61 Bombs in Europe
  • Chernobyl
  • Counterfeit Reactor Parts
  • Depleted Uranium
  • Direct Action
  • Environment
  • Environmental Justice
  • Fukushima
  • Lake Superior Barrels
  • Military Spending
  • Newsletter Archives
  • North Korea
  • Nuclear Power
  • Nuclear Weapons
  • Office News
  • On The Bright Side
  • Photo Gallery
  • Protect the Water Close Xcel's Monticello Reactor
  • Quarterly Newsletter
  • Radiation Exposure
  • Radioactive Waste
  • Renewable Energy
  • Social Issues
  • Sulfide Mining
  • Through the Prism of Nonviolence
  • Uncategorized
  • Uranium Mining
  • US Bombs Out of Germany
  • War
  • Weekly Column

Contact Us

(715) 472-4185
nukewatch1@lakeland.ws

Address:
740A Round Lake Road
Luck, Wisconsin 54853
USA

Donate To Nukewatch

News & Information on Nuclear Weapons,
Power, Waste & Nonviolent Resistance

Stay Connected

  • Facebook
  • Twitter

© 2026 · Nukewatch